Preparation
- Clean the Subfloor.
- Pull up the existing flooring.
- Check that your moisture barrier, underlayment and plank fit under your door casing and door.
- If you’re gluing the new flooring to the subfloor, use a sander to remove paint, oil, wax, adhesives, sealers or other material.
Finishing Up
- Avoid heavy traffic on the new installation for 72 hours while adhesive sets.